Malbunka copper Mine, Western Aranda, Ltalaltuma, Australia
Locality: Malbunka copper Mine, Western Aranda, Ltalaltuma, Australia
Description: Photo 5. Adam Abersteiner and Logan Williams deepening the Adit face floor with a brand new Chinese Dragon electric hammer designed to break 20 cms of concrete. The floor is a half metre thick of tough silicified sedimentary injectite and given Logans size and posture we had to buy a special tool to drop the floor for the taller workers.