Description: With progress going well above, and needing to clear out the hole of all the waste rock I’d dumped, I shifted to give myself a break and began mucking. With that task completed, it was time to begin undercutting the wall. To accomplish this, I had to dig the floor down about a foot (30 cm) beneath the plate’s base along its entire length.
All pictures, text, design © Forum FMF 2006-2025