Description: After a long day of work, it was found that the basalt that covers the geode is extremely hard, geode close to the ceiling and suspended in the caliper more difficult than expected, as it is completely detached from the walls of the tunnel is determined the work suspension on security grounds, leading to the next stage.
In the workshops of the company we are working with Cato and Omar "designing" the means of transport to carry the "Monster "outside.
All pictures, text, design © Forum FMF 2006-2024