Work on the upper bench revealed a fractured zone that ...
Description:
Work on the upper bench revealed a fractured zone that allowed progress into ledge. After a point we were able to put the 100 ton ram in the slot and break rock on both sides of the slot.
All pictures, text, design © Forum FMF 2006-2024